Shijiazhuang Haichuan Machinery Co., Ltd.
Shijiazhuang Haichuan Machinery Co., Ltd.
plastic egg tray mould factory
  • plastic egg tray mould factory
plastic egg tray mould factory

plastic egg tray mould factory

Delivery Time:
7 Days
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Hebei, China (Mainland)
Product Description
Product Description
egg trays pulp molded   Company Information         Shijiazhuang Haichuan Machinery Co.ltd The first manufacturer to sell and produce egg tray machine in Shijiazhuang CIty  . We have the strong scientifc research in improving the prodcution process . Now  Our technical team can make high effciency ,save enery egg tray machine .  And  The  most improtant , we not only have the machine product  factory and workshop , but also we have the egg tray production line .  You would learn the egg tray making process , and also we would find the machine problems , and improve the egg tray machine quality  .         Product Description     Molds specification  :   mold tray for electronic balance/molded pulp packaging/trays /pulp trays/ use to pack all kinds of product,egg,fruit, household appliances, electronics..etc molded trays   Material : aluminuium and plastic      1.To protect the product from hinting during the way from factory floor to store, from retailer to final user and to keep accessories such as wires, control units and batteries in place,make the transport will much Safely; 2.green and harmless; 3.Molded pulp is made of recyclable paper,used for cushion package, green and harmless; 4. Size: various sizes available 5. Thickness: decided by the weight of the products you want to pack,2cm-4cm. 6. Color: white,black,brown,blue,green 7. N.W.: 20g/pc ~ 100g/pc   Mold Design and production schedule :   1.Sample or 3D drawing recevied ,about 3 days for evaluation and 3D drawing confirmed with clients;   2.Material prepared well in 5 days at the same time for mold designing;   3.About 20 days for mold production;   4. About 3 days for Test 1/ mold test 1;   5.Mold delivered  or keep on plastic parts production in 2 days;   6.About 25 days for plastic products mass production in our factory based on the quantity and requirements.   Mark:  All the items are depend on the quantity and customized requests. Welcome !         All kind of molds to make your requires:    Factory for mold machine :

Send your message to this supplier

  • Ms. Catherine Yang

  • Enter between 20 to 4,000 characters.