Hebei ShuoWei Metal Manufacturing Co.,Ltd.
Hebei ShuoWei Metal Manufacturing Co.,Ltd.
construction hot dip galvanized steel scaffolding for Middle East
  • construction hot dip galvanized steel scaffolding for Middle East
  • construction hot dip galvanized steel scaffolding for Middle East
  • construction hot dip galvanized steel scaffolding for Middle East
  • construction hot dip galvanized steel scaffolding for Middle East
  • construction hot dip galvanized steel scaffolding for Middle East
  • construction hot dip galvanized steel scaffolding for Middle East
construction hot dip galvanized steel scaffolding for Middle East
construction hot dip galvanized steel scaffolding for Middle East
construction hot dip galvanized steel scaffolding for Middle East
construction hot dip galvanized steel scaffolding for Middle East
construction hot dip galvanized steel scaffolding for Middle East
construction hot dip galvanized steel scaffolding for Middle East

construction hot dip galvanized steel scaffolding for Middle East

Delivery Time:
10 Days
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Hebei, China (Mainland)
Product Description
Product Description
construction hot dip galvanized steel scaffolding for Middle East     Introduction Scaffolding is a temporary project which installed, used, and removed by the construction unit in order to meet the needs of the construction. A project needs to build a variety of scaffolds, such as scaffolds for workers operation, the scaffolds for traffic safety, also the scaffolds for formwork templates support and bearing. In a word, the scaffold is an important and indispensable position in the building construction.     Application Scaffolding is mainly used for the construction workers working up and down. It also can be used as peripheral safety net to enclosure or high altitude installation components, etc. Some scaffold also be used as template in advertising municipal administration, traffic bridge, mine etc.     Installation Requirments Bowl type steel pipe scaffold column horizontal distance of 1.2 m, the vertical distance according to the scaffolding load can be 1.2 m;1.5 m;1.8 m; Step distance 2.4 m, 1.8 m, 2.4 m. The erection of poling extension should be staggered, the first layer poling application of 1.8 m and 3.0 m long poling stagger arrangement, up 3.0 m long, to the top with a length of 1.8 m and 3.0 m two leveling. Lowe than 30m, the scaffolding verticality deviation should be controlled within 1/200, higher than 30m high scaffolding should be controlled in 1/400 ~ 1/600, total high verticality deviation should be not bigger than 100 mm.   Detailed Size List

Name

Bowl Buckle Scaffolding

   

Brand

SHUOWEI (SW)

Pipe Diameter

48 mm

Pipe Thickness

3.2/3.0/3.5/3.8 mm

Cross-pipe Length

0.3, 0.6, 0.9, 1.2, 1.5, 1.8, 2, 2.4 mm

Vertical-pipe Length

0.6, 1.5, 2, 2.5, 3 mm

Surface

Painted, Hot-dip Galvanized

Advantages

Durable, fast, easy to install 

Main Components of Bowl Buckle Scaffolding Producing process Packaging & Shipping Our Services Free sample will be supplied for testing, kindly email us for more details.
Engineer 24 online for installation service

Sales Representative: Maggie
Tel: +86 0311 89836929
Fax: +86 0311 89836929
Mob: +86 15933117472
Skype: dx-hf
Wechat: 1019812720 detailed images     Related Products

Send your message to this supplier

  • Mr. Leo Wang

  • Enter between 20 to 4,000 characters.