Hebei Jinbangzi Boiler Co.,Ltd.
Hebei Jinbangzi Boiler Co.,Ltd.
Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
  • Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
  • Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
  • Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
  • Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
  • Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
  • Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier
Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier

Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier

Delivery Time:
30 Days
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Hebei, China (Mainland)
Product Description
Product Description
  Hot Water Output 0.5-25 t/h Industrial Wood or Coal Boiler Supplier     coal fired hot water boiler feature:           1.Spirally corrugated tube (1) Heat transfer enhancement; (2) Improve the suppleness to avoid the tube plate cracking; (3) Clean groove itself. 2.Arched tube plate   (1) reduce the thermal stress of weld; (2) improve the tube plate suppleness; (3) simplify the structure and save the boiler room space. 3.Complete protection device deal with the situation of overpressure, over-temperature, water shortage and flameout. 4.Up-tube layout  (1) Avoid the bulging on boiler drum; (2) Promote the water cycle (3)clean the sediment in the boiler bottom. 5.Airfoil flue Lower the high temperature of tube plate flue gas. And then reduce the thermal load of the boiler bottom. 6.The return water injector  Function: Increase the reliability of the water circulation and avoid the booster caused by the poor circulation.   water boiler process     Before the products leave our factories, all the matters relevant to boilers will be undertaken by our company, such as equipment decoration in boiler room and also satisfactory, free-charge service will be offered by us until the turn-key project. The replacement is guaranteed if any problem concerning the product quality arises within a year. In the manufacturing process, clients are quite welcome to our factory to examine the actual quality and to carry out the follow-up inspection.      the factory   customer  Warranty and after-sale service BZ promises the top quality of every set of machine and best after-sales service as followings : (A)   The boiler body guarantee is one years , for accessories two years (B)   During the guarantee period , if the main body defective or broken without wrong operating , Honor must replace the parts for free or prepare the spare-parts for free. (C)   BZ should provide boiler technical service and operation guidance for whole life  long. (D)   Regarding to the installation and training , the buyer should take all the correlative charges (accommodation and food , round -trip tickets) contact us skype: charliesun327 whatsapp:00+86+18630107521 cell:86+18630107521 email:charlie AT bangziboiler.com

Send your message to this supplier

  • Mr. jack shi

  • Enter between 20 to 4,000 characters.