
Simple Installation Stainless Steel Grating for Towers: Quick Access and Solutions
-
$115.0050-99 piece
-
$110.00≥100 piece
- Min. Order:
- 1 piece
- Min. Order:
- 1 piece
Your message must be between 20 to 2000 characters
Contact NowPayment Type: | L/C,Western Union,T/T |
---|
Packing support grating plate
is the simplest and most widely used packing support plate. It is welded onto the tower walls directly or welded onto the support frame on the tower wall. Cast iron grating plate is widely used in the chlor-alkali chlorine alkali industry and sulfuric acid industry. Grating plate is widely used to support the structured packing. Sometimes, it is also be used to support the random packing, such as ceramic cross ring. When it is equipped with ceramic cross ring, it should be placed for several layers and the diameter is decreased by turns from bottom to top.
Materials:
1.Carbon steel.
2.Cast iron.
3.Plastic. Including PP,RPP,PVC,CPVC, PVC,PTFE
4,Stainless steel including 304,304L,316,316L,321,410 and so on.
5.Fiber reinforced plastic(FRP)
Application:
It is suitable for supporting the corrugated structured packing and random packing.
it is widely used in the following tower types:
Sulfuric acid absorption tower.
Drying tower.
Cooling tower
Structure of packing support grating plate
· If the tower diameter is small, it will be supplied in a whole piece.
· When the tower diameter is large, it should be divided into several parts and each parts width is between 300 and 400 mm. Moreover, the weight of each part should not be too weight to installing and uninstalling.
· < 600 mm. Grating plate are supplied in a whole plate.
· 600–800 mm. Grating plate are divided into two parts.
· 900–1200 mm. Grating plate are divided into three parts.
· 1400–1600 mm. Grating plate are divided into four parts.
Installation of our tower packing support grating plate
If the tower diameter is small, the grating plate can be welded onto the tower wall directly.
When the tower diameter is large, the grating plate should be welded on the supporting ring or supporting plate for reinforcement.
Our stainless steel packing support grating plate frame
The packing support grating plates can be supplied with or without outer frames.
Grating plate without frame. It will be welded onto the supporting plate or supporting ring on the tower packing.
Grating plate with frame. The bolts and nuts can be designed to the grating plate for easy assembling and fastening.
--- F A Q ---
Q: Are you trading company or manufacturer ?
A:We are the factory, the factory can directly deliver goods, no middlemen to earn the price difference, we directly quote the most favorable price to the customer.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Our team:
1) Reply your enquiry within 24 working hours
2) Customer order available, OEM and ODM are welcomed;
3) All the goods are inspected by professional QC before delivery;
4) Shipping the goods to our customers all over the world quickly and precisely;
5) Good after sales service, any product issues can be handled promptly;
6) Professional & Integrity, your faithful and long-term partner.
Related Keywords