Shijiazhuang SY Import Export Co., Ltd.
Shijiazhuang SY Import Export Co., Ltd.
Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
  • Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
  • Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
  • Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
  • Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
  • Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
  • Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65
Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65

Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65

Delivery Time:
30 Days
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Hebei, China (Mainland)
Product Description
Product Description
  Automatic Razor Barbed Wire Making Machinery BTO,22,28 30 CBT60,65   Razor barbed wire machine include razor strips making machine and wire coiling machine,there are 2steps in productionprocess,there are 2 different machines would finish all work.(razor strips making machine,coiling machine),this machine have different mold, it can make different razor by changing it mold.  

Model

 Punching machine Five strips

Coiling machine

Voltage

380V, 50Hz                      

380V, 50Hz

Power

2.2kw

1.5kw

Work speed

220-280m/h

80kgs/h

Pressure

40Ton

 

Weight

3.2t

300kgs

Thickness of the sheet

0.5±0.05(mm)

 

Wire diameter

 

2.5mm

Dimension(mm)

1600x1180x2310mm

1100*750*1200mm

        Packaging & Shipping             Guarantee and After-sale Service:   1.Warranty: Two Years. 2.Enough spare parts of machines could be supplied. 3.Factory Own Designing and Inspection Team. 4.All machines were tested and adjusted before delivery. 5.Engineers avaliable to service machinery overseas: Worker-training,     installation.etc. 6.24 hours technical support by e-mail or calling service     Certificate:                    

Send your message to this supplier

  • Mr. Mark Li

  • Enter between 20 to 4,000 characters.