Shijiazhuang Haosen Business Service Co., Ltd.
Shijiazhuang Haosen Business Service Co., Ltd.
3D Panel House
  • 3D Panel House
3D Panel House

3D Panel House

Payment Type:
T/T, L/C, D/A, D/P, Western Union
Min. Order:
1 Set/Sets
Min. Order:
1 Set/Sets
Delivery Time:
30 Days
Transportation:
Ocean, Land
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: China
Payment Type: T/T,L/C,D/A,D/P,Western Union
Transportation: Ocean,Land
Product Description
Product Description

PRODUCT DESCRIPTION

What is the benefit for 3D panel building system?

1.low cost

2.Simple installation,shortening of construction time

3.Thermal and sound insulation

4.Durable or low-maintenance

5.Environment friendly

6.Recycled green products

7.Fire & Moisture proofing

8.Hurricane & Earthquake protection

EPS 3D panel Installation

1.Install 3D wall panel

①Rebar installation

Install rebar on foundation beams, floor slabs, columns and beams, where the panels are to be installed. The rebar are installed in an alternating ([zigzag") pattern. For steel structures, the rebar are welded onto the steel beams and columns.

②Attach the 3D panel together

Prepare panels according to plan drawings, or trim panels if they arrive in modular typical sizes, according to the needs. Tie the panel onto the rebar using tie wire.

③ Window & Door

The opening of window and door should be cut well before install the wall panel.Install cross braces on each corners of door and window openings, on both side of the panels. Mount U-mesh around the perimeter of door and window openings.

④ Corner mesh

Install [U" type mesh or [Angle" mesh at each corner at full length of the corner on both inner and outerside. The angle mesh service as additional bracing to allow corner to function as columns after concrete is applied.

⑤ Support braces and alignment

Install supports, and perform alignment for the panels, so they are installed straight and each plane is perpendicular to each other.

⑥First plastering and guide installation

Apply first layer of concrete on both side of the panels, using shotcrete machine. Afterwards, install guidance to ensure consistent thickness of the second (final) layer of plaster.

⑦Second plaster

Apply the second layer of plaster, then smoothen the surface using screed.

⑧Skim coat/Finishing

Wall is ready for finishing by skim coat or paint.

2.Install 3D panel slab, floor panel, roof

①Installation of scaffolding and formwork

Install scaffolding and prepare formwork. If desired, fenolite sheeting can be applied at this stage.

②Panel and beam reinforcement installation

Place panels on top of formwork, tie them to installed rebar, insert steel reinforcement into the trenches on floor panels.

③ Concrete pouring/casting

Cast the void between formwork and the panels with concrete mix without aggregate, followed by concrete mix with aggregate for topping up and filling of the reinforcement trenches.

④Finishing

Screed surface until perfectly level. Afterwards, surface can be used to mount tiles, carpet, etc.