
Screw Pile Steel Galvanized Ground Screw Foundation
- Min. Order:
- 300 Piece/Pieces
- Min. Order:
- 300 Piece/Pieces
- Transportation:
- Ocean, Land
- Port:
- Tianjin
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Hebei China |
---|---|
Productivity: | 60000PCS/per Month |
Supply Ability: | 2000PCS/per Day |
Payment Type: | L/C,T/T,D/P,D/A |
Incoterm: | FOB,CFR,CIF,EXW |
Certificate: | GB DIN EN ISO1461-1999 |
HS Code: | 73269090 |
Transportation: | Ocean,Land |
Port: | Tianjin |
Garden's foundation free sample Ground Screw Pile is our popular product,we can send free Ground Pile sample to you for testing,but you may need to pay for shipping.Once your order is confirmed,the cost of the sample can be deducted from the cost of the confirmed order,so the sample is free for you.This is also our special offer to our guests.
Chinese professional manufacturer of Ground Screw Pile Anchor/Ground Screw Pile with more than 15 years experience.Galvanized Ground Screw is made of carbon steel according to standard of DIN EN ISO 1461-1999 .
The main parameters of Ground Pile are as follow:
Material of Helix Ground Screw Pile
Q 235 or Q 355 carbon steel
Length of Ground Screws Pile
500-6000 mm
Diameter of pipe of Helical Pile
48 mm,60 mm,68 mm,76 mm,89 mm,114 mm,140 mm,219 mm or according to clients' request
Thickness of pipe of helix Pile
2.5 mm,2.75 mm,3.0 mm,3.5 mm,3.75 mm,4.0 mm
Nut of Screw Pile
M 10,M 12,M 14,M 16 or according to clients' request
Continuous welding with auto welding machine for Helical Ground Screw .
Surface treatment of Ground Screw Anchor:Hot dip galvanized,according to DIN EN ISO 1461-1999,thickness of coating zinc: more than 80 micron.After hot dip galvanizing,the Ground Pile has good corrosion resistance.
Advantages of Ground Screw Piles:
1)Ease of installation.
2)Little to no vibration.
3)Immediate load transfer upon installation.
4)Installed torque correlates to capacity.
5)Easily load tested to verify capacity.
6)Installs below active soils.
7)All weather installation.
8)Little to no disturbance to Jobsite.












Related Keywords