
Heat Resistance Conveyor Belt
-
USD8.97≥100 Meter
- Payment Type:
- L/C, T/T
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 100 Meter
- Min. Order:
- 100 Meter
- Delivery Time:
- 10 Days
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | shijiazhuang |
---|---|
Productivity: | 5000 meter per day |
Supply Ability: | 5000 meter pey day |
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR,CIF |
Certificate: | ISO,GB/T7984-2013,DIN22102,,AS1332-2000 |
Quick Information
- Brand Name:xiongte
- Place of Origin:China
Description
Technical requirements: implement GB/T2002-2005 standard
This product is widely applied in metallurgy building materials, casting and other departments for delivering sintered ore, heat coke, cement, slag, hot castings, etc.
1. Pure cotton canvas or other materials are used as casing ply and the covering layer is made of the rubber materials with excellent heat-resistant quality.
2. Product structure: one kind is same to ordinary conveyor belt the other kind is adding one layer of thermal-protective coating between covering layer and casing ply.
According to different testing temperature:
T1type: able to stand a testing temperature of ≤100℃
T2type: able to stand a testing temperature of ≤125℃
T3type: able to stand a testing temperature of ≤150℃
T4type: able to stand a testing temperature of ≤175℃
Cover Physical Properties after Heat-Resistance Test
Item | Type | ||||
1 | 2 | 3 | 4 | ||
Changing scope | |||||
Sclero | Different before and after ageing test (IRHD) | +20 | +20 | ±20 | ±20 |
Max. of after aging test (IRHD) | 85 | 85 | 85 | 85 | |
Tensile strength | Properties changing rate by reducing %≤ | -25 | -30 | -40 | -40 |
Min. of after aging test (Mpa) | 12 | 10 | 5 | -5 | |
Elongation ultimate | Changing rate of properties %≤ | -50 | -50 | -55 | -55 |
Min. of after aging test % | 200 | 200 | 180 | 180 | |
Note: aging test (100℃X168h, 150℃X168h) |

Packaging & Delivery
- Packing :According to customer requirements
- Delivery Lead Time :After received deposit(within 10 days)
- Minimum Order :100 meters
- Supply Ability :50,000 meter per day
Related Keywords