Hebei Dongshengyuan Trading Co.,Ltd.
Hebei Dongshengyuan Trading Co.,Ltd.
Easy-to-Handle Construction Aluminum Formwork System
  • Easy-to-Handle Construction Aluminum Formwork System
  • Easy-to-Handle Construction Aluminum Formwork System
  • Easy-to-Handle Construction Aluminum Formwork System
  • Easy-to-Handle Construction Aluminum Formwork System
  • Easy-to-Handle Construction Aluminum Formwork System
Easy-to-Handle Construction Aluminum Formwork System
Easy-to-Handle Construction Aluminum Formwork System
Easy-to-Handle Construction Aluminum Formwork System
Easy-to-Handle Construction Aluminum Formwork System
Easy-to-Handle Construction Aluminum Formwork System

Easy-to-Handle Construction Aluminum Formwork System

Payment Type:
L/C, T/T, Western Union
Incoterm:
FOB, CFR, CIF
Min. Order:
100 Square Meter
Min. Order:
100 Square Meter
Delivery Time:
20 Days
Transportation:
Ocean, Land, Air
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Hebei China
Productivity: 10000square meter per month
Supply Ability: 10000square meter per month
Payment Type: L/C,T/T,Western Union
Incoterm: FOB,CFR,CIF
Certificate: ISO, SGS, or as your request
Transportation: Ocean,Land,Air
Product Description
Product Description

Products Description:

  • We have professional technicist, who will help you to finish all the drawings and according to your drawings to give out the best solutions.  skilled workers, who can guarantee the quality of formwork and surely the best production machines. Air-operated Cutter; Pneumatic Guillotine. Multihead Punching Machine and Multi-spindle Milling Machine. Aluminum formwork system is suitable for the high degree of standardization tall buildings or multi-layer buildings and villas. The biggest application contractor in China is Wanke,  Baoli, lvcheng Group, Dahua etc.

Aluminum formwork for sales

Aluminum Formwork Panel Advantages (1---10)


1. Short construction. 

  • Aluminum formwork system is quick release system,  a set of formwork for one floor,  just need 4days.  Improve the construction progress and save cost. 

2. Turns more and good economic benefit .

  • Formwork can be re-used over 300-500 times and still keeps high quality to finish forming concrete surface.  Also the average cost of using in each time is low.   

3. Lighter weight, Construction more easily, conveniently and effectively. 

  • The weight of aluminum formwork is around 20KG/m2. The whole assembly process could be finished without any machines assist. The workers just need a spanner and a hammer to assemble the whole system easily.   20-30 square meters per person per day can be installed. 

4. Good stability, high bearing capacity. 

  • The formwork made of 6061-T6 aluminum alloy plate and aluminum alloy profile. The system formed to a frame structure after assembling, its load bearing capacity reach to 60KN/m2.  

5. The wide scope of application.

  • Used in reinforced concrete field: wall, floors, windows, post, beam, bridge, etc.  

Aluminum Formwork sheet

Aluminum Formwork System

6. Little flat-fell seam, high precision. Good surface after dismantling. 

  • The concrete surface after dismantling. It would be a very high quality finishing. The concrete surface is flat,  smooth. No need a heavy backing plaster. Effectively for plaster cost saving. 

7. Independent support system & tidy. 

  • Spare parts included pins and wedges should be recycled. Work site would be a safety, clean and tidy environment. Supporting system construction is simple,convenience and clean. Contrast to traditional formwork systems, aluminum formwork system used less supporting rods, it leave more space for walking or materials transportation. 

8. Standard, and Highly optimized for general use. 

  • Has more specifications. It is according to the project with different size be assembled. Reduce the cost.

9. High Recyclable Value

  • Dimensions of most of the formworks which used in different structural drawings are the same. It means that when you have a new different project, 70%-80% formworks of the last project could be recycled.  After formworks lost a value in usage, the aluminum material could be re-sold to the market with a high price. 

10. Conform to the Low-Carbon Economic requirements

  • All the materials in the formwork system are recyclable materials. Most countries have been set a rule to prohibit using wooden formworks due to environment protection.  Aluminum formwork is the best substitution. 

China supplier Aluminum Formwork System


Comparison of Aluminum Formwork and Wood Formwork

aluminum formwork system


Component for Aluminum Formwork Panel

China Aluminum formwork panel

Aluminum formwork panel factory


This Video Shows our Company History,pls check the link as below:

https://www.youtube.com/watch?v=h9n9Vydy7O0

Jointing formwork --- wall formwork--- beam forms---- stair formwork ---- concreting ---quality checking---- formwork-stripping
professional Aluminum Formwork System

Aluminum formwork panel with high quality

Welcom to inquiry about aluminum formwork system. Pls feel free t o contact us. Thank you! 

Vicky Card

Send your message to this supplier

  • Ms. wendy

  • Enter between 20 to 4,000 characters.