
Forged Fitting-Coupling of the A 105 Materials
- Payment Type:
- L/C, T/T, Western Union
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 100 Piece/Pieces
- Min. Order:
- 100 Piece/Pieces
- Delivery Time:
- 45 Days
- Transportation:
- Ocean, Land, Air
- Port:
- Xingang Tianjin
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 50 tons/ Week |
Supply Ability: | 500 Tons/Month |
Payment Type: | L/C,T/T,Western Union |
Incoterm: | FOB,CFR,CIF |
Certificate: | ISO,API,BS |
HS Code: | 73079300 |
Transportation: | Ocean,Land,Air |
Port: | Xingang Tianjin |
Forged Fitting-Coupling of the A 105 Materials
Details:
Steel hign pressure forged fittings
1. Material :Carbon steel ASTM A105, Stainless steel SS304/SS304L/SS316, Alloy
2. Standard: ASME, ANSI B16.11, MSS SP-79/83/95/97, JIS, B2316
3. Pressure: Rating Threaded Fitting: 2000LB/3000LB/6000LB(Sch40, Sch80, Sch160)
4. Socket Welding: 3000LB/ 6000LB/9000LB(Sch80, Sch160, xxs )
5.Type: Forged Threaded Pipe Fittings(NPT/BSPT/BSPP), Socket Welded
6 Specification: Elbow, Tee, Coupling, Half Coupling, Cap, Plug, Bushing, Union, Out-Let, Swage Nipple, Bull Plug, Reducer Insert, Hex Nipple, Street Elbow, Boss and etc.
7. Surface: Blasting oil, Black paint
8 Size :1/8"---4"
9. Connection: Thread , Socket welded
10. Shape : Equal, Reducing
11. Package: Carton, Wooden case or as Buyer's request
12. Applications : Petroleum, Electric Power, Chemical Industry, Light Industry, Metallurgy, The shipping, Urban construction and Other Professions
Pictures:
Our Company:
Packing:
Shipping:
If you are interested in our products, please kindly let me know.
Related Keywords