
Gable Border and Snow Stopper forming machine
-
$25000.00≥1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Transportation:
- Ocean, Land, Air, by train
- Port:
- TIANJIN, XIAMEN, SHANGHAI
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | CHINA |
---|---|
Productivity: | 500 SETS |
Supply Ability: | 500 SETS |
Payment Type: | L/C,T/T,D/P,Paypal,D/A |
Incoterm: | FOB,CFR,CIF,EXW,FCA,CPT,CIP,DEQ,DDP,DDU |
Certificate: | ISO 9001 / CE |
HS Code: | 84552210 |
Transportation: | Ocean,Land,Air,by train |
Port: | TIANJIN,XIAMEN,SHANGHAI |
Gable Border and Snow Stopper forming machine
We also can design the machine strictly according to your required profile.
Half Round Gutter Roll Forming Machine SURFACE TREATMENT
1) Processing material: steel strip
2) Material thickness: 0.3-0.7mm
3) Formed size on one machine: as per above profile drawing
4) Main motor power: 5.5kw
5) Hydraulic station power: 4kw
6) Productivity: 4-10m/min
7) Roller stations: 20 steps
8) Roller material: Cr12 steel with vacuum heat treatment, hardness reaches 58HRC-60HRC
9) Active shaft material: 45#steel with high frequency surface treatment and grinding process
10) Gable Border and Snow Stopper forming machine Shaft diameter: 60mm
11) Cutting system: mould cutting, automatic cut to any length you need
12) Cutting blade material: Cr12MOV
13) Stand wall plate thickness: 22mm
14) Control system: Taiwan Delta PLC computer control system
15) Dimension of the machine: About 11000mm*1500mm*1400mm
16) Power supply: 380V, 3 Phase, 50Hz(or as per your request)
TECHNOLOGY
3t manual decoiler→guiding platform→main roll forming machine→cutting system→2m output table, 5.5kw electric-motors, 4kw electric motor on hydraulic station, PLC control system
SALES TERMS
1). Gutter Roll Forming Machine Price: Please contact us, we will try to give you good discount for starting our cooperation
2). Payment term: 30%TT should be paid as advance deposit, 70%TT before shipment
Or 100% LC at sight
3). Package: naked with simple plastic film and loaded in one 20-feet container
4). Delivery time: 50 working days after receipt of the deposit
Related Keywords