
plastic chair clips in plastic building materials
- Payment Type:
- L/C, T/T
- Incoterm:
- FOB, CFR
- Min. Order:
- 30000 Bag/Bags
- Min. Order:
- 30000 Bag/Bags
- Delivery Time:
- 15 Days
- Transportation:
- Ocean, Air, DHL
- Port:
- Tianjin
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | Hebei,China |
---|---|
Payment Type: | L/C,T/T |
Incoterm: | FOB,CFR |
Transportation: | Ocean,Air,DHL |
Port: | Tianjin |
Rebar chairs for concrete support can be used in tilt up and slab work. They are stable and economical. Its fastening system is strong and versatile.
Standard in 25 & 40, 50 & 65, 75 & 90, 85 & 100mm cover. Standard clip-on and SOG in 50 & 65mm cover.Other size could manufacture by your require.
Rebar Chair Features:
- Easy Installation with no wire tying- Saves Time!
- Strong enough to walk on the grid
- Will not collapse during the pour
- Allows concrete to flow freely through the stand
FAQ
1. How to buy your ideal products?
A: You can provide us your drawings, and we will produce it as per your drawings. Or we can design it if you do not have a clear plan.
2. How to pay?
A: TT and L/C are acceptable and TT will be more appreciated.30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantity.Generally, the delivery time will be within 15 to 30 days.
4. Package information
A:For inner box and master carton are made as per international standards,and we can make special designed for you if need.And if necessary,will be packed in pallet to avoid any damage.
B:Not more than 35kg per carton box,about 1000kg per pallet
OUR FACTORY
Related Keywords