Shijiazhuang BeiKeDeRui Metallurgical Science & Technology Co.,Ltd
Shijiazhuang BeiKeDeRui Metallurgical Science & Technology Co.,Ltd
Sewage Slurry Submersible Pump
  • Sewage Slurry Submersible Pump
Sewage Slurry Submersible Pump

Sewage Slurry Submersible Pump

Payment Type:
L/C, T/T, Western Union
Incoterm:
FOB, CFR, CIF
Min. Order:
1 Set/Sets
Min. Order:
1 Set/Sets
Delivery Time:
30 Days
Transportation:
Ocean, Land
Port:
Xingang, Shanghai, Qingdao
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Shijiazhuang,China
Payment Type: L/C,T/T,Western Union
Incoterm: FOB,CFR,CIF
Certificate: GB/T 19001-2008 idt ISO9001:2008
Transportation: Ocean,Land
Port: Xingang,Shanghai,Qingdao
Product Description
Product Description

The type with is a sump pump of extension shaft series, have the below features


– Eliminates submerged bearings, packing, lip seals, and mechanical seals

 – Unique double suction impellers; fluid flow enters the top as well as the bottom. This design eliminates shaft seals and reduces thrust load on the bearings.

– Large particle impellers are also available and enable passing unusually large solids.

 – Our maintenance friendly bearing assembly has heavy duty roller bearings, robust bearing housings, and a massive shaft.

– The metal pumps have a heavy walled abrasive resistant chrome alloy casing. Rubber pumps have a molded rubber casing adhered to sturdy metal structures.

 – The metal pump columns and discharge pipes are steel, and the rubber columns and discharge pipes are rubber covered.

– Snap in polyurethane strainers fit in column openings on the smaller sizes and steel strainers on the larger sizes prevent overly large particles and unwanted refuse from entering casing of the pump.

– Bolt on steel strainers on the metal pump and molded snap on polyurethane strainers on the rubber pumps prevent overly large particles and unwanted refuse from entering casing of the pump.

sewage slurry submersible pump

 



 

FAQ:

Q: How about payment terms?

A: 30% TT deposit + 70% TT before shipment,50% TT deposit + 50% LC balance, Flexible payment

can be negotiated.

Q: Installation and commissioning?

A: We will send our engineer for installation and commissioning, but relevant cost will be paid by you.

Q: Do you have some videos where we can see the line producing?

A: Yes, we can provide some videos for reference.



Send your message to this supplier

  • Mr. Myron Zhu

  • Enter between 20 to 4,000 characters.