
Heavy duty earth screw anchors with high service
- Payment Type:
- L/C, T/T, D/P, Paypal, Money Gram, Western Union
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 100 Piece/Pieces
- Min. Order:
- 100 Piece/Pieces
- Delivery Time:
- 30 Days
- Transportation:
- Ocean, Land, Air
- Port:
- Tianjin, Shanghai
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 2000pieces/month |
Supply Ability: | 5000pcs/month |
Payment Type: | L/C,T/T,D/P,Paypal,Money Gram,Western Union |
Incoterm: | FOB,CFR,CIF |
Certificate: | CE,ISO9001 |
Transportation: | Ocean,Land,Air |
Port: | Tianjin,Shanghai |
Heavy duty iron earth screw anchors from manufacture
Nowadays, spiral piles are very popular and have a wide range of applications because they have more advantages than traditional foundations: cost advantages. Compared with traditional foundation costs, the cost of spiral piles is one-third of the cost of traditional foundations; Advantages, spiral piles have no damage to the surrounding environment, greatly reducing the project cost; construction advantages, with professional equipment, the installation of a spiral pile time is less than one minute, and can be followed after the installation is completed The construction project shortens the construction period; the all-weather advantage, the weather factor has less marketing for installing the spiral pile; the advantage of recycling, after the installation is completed, if it is no longer used, it can be recycled and reused, saving resources and not destroying surroundings. The products we produce can ensure that the quality of our products remains excellent in the same industry and is beneficial to our customers. We use machine welding to ensure delivery time.
Number |
HDFR76*1200 |
Length |
1200MM |
Out Pipe Dia |
76MM |
Pipe Thickness |
3MM |
Weight |
9.4KG |
Material |
ISO630 Fe A / Din EN10025 Fe 360 B |
Surface Finished |
Hot Dipped Galv. As standard DIN EN ISO 1461-1999 |
Delivery Time |
25 days after get 30% prepayment |
Payment |
L/C, T/T, D/P |
MOQ |
264 pcs |
Port |
Xingang |
Payment Term |
30% prepayment, the balance at sight B/L copy. |
Package |
88pcs/pallet 1584pcs/20`container |
Product Process
Step 1: Cutting
The length of welded pipe is 6 meters and the welded pipe need to be cut by sawing machine according to customer's need.
Step 2: Heating
Putting ground screw to high frequency heating machine and make ground screw be soft so that ground screw can be shaping.
Step 3: Shrinking
Using shrinkage machine to change the shape and diameter of ground screw.
Step 4: Punching
Using punching machine to do a hole or other for ground screw.
Step 5: Welding
The spiral blade of ground screw will be welded by automatic welding machine.
Step 6: Galvanizing
The surface treatment is acid picking and hot dip galvanizing.
Step 7: Testing
Our quality control will test the goods and supply checking reports according to customer's need.
Step 8: Packing
Steel pallet is used to place ground screw and then wrap the pallet with multi-layer packaging to firm the ground screw.
Company Introduce
Hebei Honde Industrial Trade Imp&Exp Co., Ltd in Hebei province of China and established in 2002. We are manufacturer and exporter of ground screw, household foundations, professional foundations, solar foundations, pile driver, post anchor, earth anchor, beach umbrella anchor and solar mounting system.
We have built long-term business relationship with many companies around the world, such as KRINNER, ALDI, LIDL, KEMER and so on. We have been accepted by ISO9001 quality system and BSCI, BV, CE certification and have advanced automatic welding equipment. We sincerely hope have a good cooperation with you.
Related Keywords