
Popular soil foundation screw piles for sale
- Payment Type:
- L/C, T/T, D/P, Paypal, Money Gram, Western Union
- Incoterm:
- FOB, CFR, CIF
- Min. Order:
- 100 Piece/Pieces
- Min. Order:
- 100 Piece/Pieces
- Delivery Time:
- 30 Days
- Transportation:
- Ocean, Land, Air
- Port:
- Tianjin, Shanghai
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | China |
---|---|
Productivity: | 2000pieces/month |
Supply Ability: | 5000pcs/month |
Payment Type: | L/C,T/T,D/P,Paypal,Money Gram,Western Union |
Incoterm: | FOB,CFR,CIF |
Certificate: | CE,ISO9001 |
Transportation: | Ocean,Land,Air |
Port: | Tianjin,Shanghai |
Popular soil foundation screw piles for sale
With the development of the economy, the demand for infrastructure in more and more countries and regions is gradually increasing, for example, traffic control equipment, letter protection lights, surveillance cameras, bus booths and so on. In the past, the construction of these infrastructures used a variety of materials, and the steps were numerous, which led to slower construction. Nowadays, many countries and regions use galvanized spiral piles when building infrastructure. The pile is easy to use, simple to install, and greatly improves the efficiency of construction, and gradually replaces the traditional construction method. If you are interested, please contact us, I will give you more detailed information, showing the advantages of spiral piles.
Number |
HDFR76*1200 |
Length |
1200MM |
Out Pipe Dia |
76MM |
Pipe Thickness |
3MM |
Weight |
9.4KG |
Material |
ISO630 Fe A / Din EN10025 Fe 360 B |
Surface Finished |
Hot Dipped Galv. As standard DIN EN ISO 1461-1999 |
Delivery Time |
25 days after get 30% prepayment |
Payment |
L/C, T/T, D/P |
MOQ |
264 pcs |
Port |
Xingang |
Payment Term |
30% prepayment, the balance at sight B/L copy. |
Package |
88pcs/pallet 1584pcs/20`container |
Product Process
Step 1: Cutting
The length of welded pipe is 6 meters and the welded pipe need to be cut by sawing machine according to customer's need.
Step 2: Heating
Putting ground screw to high frequency heating machine and make ground screw be soft so that ground screw can be shaping.
Step 3: Shrinking
Using shrinkage machine to change the shape and diameter of ground screw.
Step 4: Punching
Using punching machine to do a hole or other for ground screw.
Step 5: Welding
The spiral blade of ground screw will be welded by automatic welding machine.
Step 6: Galvanizing
The surface treatment is acid picking and hot dip galvanizing.
Step 7: Testing
Our quality control will test the goods and supply checking reports according to customer's need.
Step 8: Packing
Steel pallet is used to place ground screw and then wrap the pallet with multi-layer packaging to firm the ground screw.
Company Introduce
Hebei Honde Industrial Trade Imp&Exp Co., Ltd in Hebei province of China and established in 2002. We are manufacturer and exporter of ground screw, household foundations, professional foundations, solar foundations, pile driver, post anchor, earth anchor, beach umbrella anchor and solar mounting system.
We have built long-term business relationship with many companies around the world, such as KRINNER, ALDI, LIDL, KEMER and so on. We have been accepted by ISO9001 quality system and BSCI, BV, CE certification and have advanced automatic welding equipment. We sincerely hope have a good cooperation with you.
Related Keywords