
Hotel Use Prefab Modular Bathroom Pod
- Payment Type:
- L/C, T/T
- Incoterm:
- FOB, CIF
- Min. Order:
- 50 Square Meter
- Min. Order:
- 50 Square Meter
- Delivery Time:
- 25 Days
- Transportation:
- Ocean, Land, Air
- Port:
- TIANJIN
Your message must be between 20 to 2000 characters
Contact NowPlace of Origin: | china |
---|---|
Productivity: | 8000 M2/month |
Supply Ability: | 8000 M2/month |
Payment Type: | L/C,T/T |
Incoterm: | FOB,CIF |
Certificate: | ISO SGS |
Transportation: | Ocean,Land,Air |
Port: | TIANJIN |
Quick Information
- Brand Name:WZH
- Place of Origin:China
- Model Number :010
Description
Bathroom pod is ideal for large-scale building project now, especially hotel, school, healthcare, student accommodation, and some residential building. This type modular bathroom units can be made significantly more efficient and profitable by exact specifications of each client to guarantee complete satisfaction.
The structure of the bathroom pod toilet is light gauge steel framing which is made of cold formed galvanized or galvalume steel material, Z275/AZ150, high strength G550. The vertical structure will be supplied with holes in advance for the passage of electrical cables and hydraulic pipes.
Insize views
Structure:
Why choose bathroom pod?
Our light gauge steel framing(LSF) bathroom pod allow clients to achieve a cost which is far lower than traditional construction method, use modular bathroom pod:
1 | Greatly reduce build costs. |
2 | Save construction time and labor cost |
3 | Reduce the risk of project delay |
4 | Lower carbon because of fewer materials wasted |
5 | Less risk of health and safety problems on site |
6 | Easy and fast install, reduce supervision of skilled labor |
7 | Fully fitted and preassembled, installation can be finished in a matter of hours |
8 | Fully finished and can be loaded and transported directly, also convenient to load and unload. |
Application

Price
- Delivery Port :According to customer requirements
Packaging & Delivery
- Packing :According to customer requirements
- Delivery Lead Time :25 days
- Supply Ability :8000 M2/month
Product Image
Related Keywords